The revised PDO is to assist the Recipient in: (i) increasing the coverage of drained and irrigated areas in Bobojon Gafurov andKannibodom raions, respectively; and (ii) strengthening the early warning system of the Kayrakkum dam as well as carrying out ageotechnical study for assessing the risks associated with said dam.
World Bank.Author:De Jong,Ijsbrand Harko.Document Date: 2011/12/03.Document Type: Implementation Status and Results Report Report Number: ISR4612
x