This Hubei Xiangfan Urban Transport Project aims to establish a complete traffic network system in Panggong Subdistrict, promote the development of this district, and improve the public transport system in Xiangyang city, enhance the capability of traffic management organizations and improve traffic control.
Negative impacts include: impacts on social environment through implementing relevant policies, impacts of the project construction on social environment, influence ambient air quality, influences on surrounding residents, schools and hospitals, pollutions from construction activity are discharged into surface water body, influence on health, and influence on the fauna and flora.
Mitigation measures include: 1) strictly control the working area of construction and avoid widening the construction site without authorization; 2) install the separating wall around the construction site; 3) it is required to prepare one watering car at least for each construction site. The spraying frequency will be determined according to the weather condition; 4) low-noise mechanical equipments or equipments with sound insulation or sound reduction should be selected; 5) during the periods of college and high school entrance examination, it is forbidden to take out the construction around schools; 6) it is prohibited to allow the construction activity inside the bank of Hanjiang River; and 7) domestic waste should be stored at fixed points, daily cleaned up
CN-Hubei Xiangyang Urban Transport -- P119071; Document Date.2011/11/01.Document Type:Environmental Assessment.Report Number E2868
No comments:
Post a Comment
prueba