Saturday, December 3, 2011

India.Fourth Power System Development Project:procurement plan

PROCUREMENT PLAN UNDER PSDP-IV LOAN [AS ON 30.09.2011].2500 MW HVDC BIPOLE ALONGWITH BIPOLE CONVERTOR STATIONS AT BALIA & BHIWADI.NORTH-WEST TRANSMISSION CORRIDOR STRENGTHENING SCHEME.WESTERN REGION SYSTEM STRENGTHENING SCHEME-II (SET-B).WESTERN REGION SYSTEM STRENGTHENING SCHEME-II (SET-D).EAST - WEST TRANSMISSION CORRIDOR STRENGTHENING SCHEME.EASTERN REGION STRENGTHENING SCHEME-I.SYSTEM STRENGTHENING - XIII IN SOUTHERN REGION.
Document Date:  2011/09/30.Document Type:  Procurement Plan.Report Number: 65855.Volume No:1 of 1

j