SOUTHEASTERN ASIA

Brunei

Cambodia
Provincial Roads Improvement Project. The project will (i) improve Cambodia's provincial road network in four provinces -- Kampong Chhnang, Kampong Speu, Prey Viang, and Svay Rieng; (ii) improve the Ministry of Public Works and Transport's (MPWT) road asset management capabilities through an enhanced axle load control program; and (iii) help the MPWT establish a community-based road safety program for the project provinces. The project also supports road design and planning for climate resilience and disaster management, including emergency preparedness, mitigation, and response. The feasibility study for the project was prepared through an ADB TA to the Government (TA 7665-CAM).
Greater Mekong Subregion: Rehabilitation of the Railway in Cambodia Project. Project Number. 37269- 06. Impact: Increase in domestic and regional trade movement on the railway. Outcome: The railway is sustainable and efficiently operated. Outputs Railway link to Thailand reconstructed Rail links to Sihanoukville port and the port in Phnom Penh rehabilitated and extended Freight facilities in Samrong and Phnom Penh constructed Railway department staffed and operational Affected households living within the railway ROW and stations satisfactorily compensated and assisted
Amendment to Agreement for Grant TF058146 Ref. Closing date and Reallocation of Proceeds Conformed. Author:Levesque,Roch.Document Date: 2011/12/28.Doc Name: Rel. Proj ID: KH-Avian And Human Influenza Control And Preparedness Emergency Pr-- P100084; TF No/Name: TF058146-AVIAN AND HUMAN INFLUENZA CONTROL AND PREPAREDNESS EMERGENCY PROJECT.Unit Owning: Southeast Asia Sustainable Dev (EASTS).UN Registration No: LICUN.
Amendment to Agreement for Grant TF056832 Ref. Closing Date Conformed. Language: English. Rel. Proj ID: KH-Avian And Human Influenza Control And Preparedness Emergency- P100084; TF No/Name: TF056832-PHRD-CAMBODIA: AVIAN AND HUMAN INFLUENZA CONTROL AND PREPAREDNESS EMERG.Unit Owning: Southeast Asia Sustainable Dev (EASTS).UN Registration No: LICUN. Originating Unit: Resource & Administration Team (LEGRA)Author:Levesque,Roch; Document Date:2011/12/28.Document Type:Agreement.Disclosure Date: 2012/01/05
Avian and Human Influenza Control and Preparedness Emergency Project: restructuring.The overall development objective of the Avian and Human Influenza Control and Preparedness Emergency Project is to support the implementation of the Cambodia Comprehensive Avian and Human Influenza (AHI) National Plan contributing to minimize the threat posed to humans and the poultry sector by AHI infection in Cambodia, and to prepare for, control, and respond if necessary to a human influenza pandemic.World Bank.Document Date: 2011/12/12.Document Type:Project Paper.Report Number:66194. Data Sheet.
Land Allocation for Social and Economic Development: P084787 - Implementation Status Results Report: Sequence 04 World Bank.Author:Chamroeun,Mudita; Document Date:2012/01/01. Document Type: Implementation Status and Results Report. Report Number: ISR3063
Indonesia
Amendment to the Financing Agreement for Credit 4204-ID Conformed.Author:Good,Melinda.Document Date: 2011/10/19. Document Type:Agreement. Disclosure Date: 2012/01/06.Rel. Proj ID:ID-Third Water Supply And Sanitation For Low Income Communities Pr--P085375.Sector: Central government administration ; Water supply ; Sanitation ; Sub-natl govt admin ; Other social service.TF No/Name: TF030767-IDA CONSULTANTS POOLED CTF-FY06. Unit Owning: Indonesia Sustainable Devlpmnt (EASIS)
Amendment No. 2 to Administration Agreement for AusAID Grant TF071266 Conformed. Author: Good,Melinda; Document Date:2011/12/07.Document Type: Agreement. Disclosure Date: 2012/01/05. Doc Name: Amendment No. 2 to Administration Agreement for AusAID Grant TF071266 Conformed.Language: English. TF No/Name: TF071266.Unit Owning: Indonesia Sustainable Devlpmnt (EASIS). UN Registration No: LICUN. Originating Unit: Resource & Administration Team (LEGRA)
Infrastructure Finance Facility: P092218 -Implementation Status Results Report: Sequence 04.The objective of the Project is to strengthen and further develop the institutional framework of the financial sector to facilitate financing of commercially viable infrastructure projects and thereby increase provision of private infrastructure in Indonesia.Author: Drees-Gross,Alexandra L.Document Date:2012/01/04.Document Type: Implementation Status and Results Report. Report Number:ISR5629
Java-Bali Power Sector Restructuring and Strengthening Project. The objective of the Java-Bali Power Sector Restructuring and Strengthening Project for Indonesia is to improve the reliability and efficiency of the power system in Java-Bali and strengthen Perusahaan Listrik Negara (Persero), or PLN and Perusahaan Gas Negara (PGN) management capabilities.World Bank.Document Date: 2011/12/27. Document Type: Project Paper. Report Number:661921. Data Sheet
Supporting Water Operators' Partnerships. ADB.PROYECT N.44090-02.A.T.F.- Australian T.A. Grant US425.000. The Technical Assistance (TA) Supporting Water Operators Partnerships in Indonesia provides technical and financial assistance, through a demand driven approach, to urban water utility operators that want to improve their services.


Lao People's Democratic Republic
Road Sector Project: P102398 - Implementation Status Results Report: Sequence 02.The Project Development Objectives are (a) to improve road services on two main national corridors and the provincial road network, (b) to rehabilitate roads damaged by Typhoon Ketsana, and (c) to establish and operationalize a contingency fund for quick disaster response in the road sector.Author: Southivong,Sombath; Document Date: 2012/01/04 Document Type: Implementation Status and Results Report Report Number:ISR5373 
Strengthening Biodiversity Protection and Management in the Nam Ngum 3 Hydropower Project. ADB. PN:41385- 06.ADB will recruit three distinguished international specialists to provide technical assistance to the government The specialists will be required with expertise in (i) biodiversity assessment; (ii) protected/conservation area management; and (iii) social assessment including Indigenous People. The assistance will be for 190 person-days of technical advisory services. The IAP will be supported by specialists in additional disciplines, as needed. The assignment will be completed by December 2017

Malaysia 

Myanmar 

Philippines 
SINGLE WELL ENGINEERED ELECTRICAL TURBINE SYSTEM (SWEETS) GEOTHERMAL POWER PROJECT.ADB.PN 45927-01.The PPTA is consistent with ADB's Country Strategy and Program for the Philippines, which lists inadequate infrastructure as among the six major constraints for the country to achieve rapid poverty alleviation. The Country Operations Business Plan (2009-2010) for the Philippines encourages support for the development of critical infrastructure by the private sector consistent with Strategy 2020. Among the critical infrastructure needed to improve the quality of life and spur economic growth in the country is the cost-efficient expansion and improvement of electricity infrastructure, particularly in remote rural areas and isolated islands where the Government aims to achieve 90% electrification at the household level by 2017.
Road Improvement and Institutional Development Project. The Asian Development Bank has approved a loan and administration of cofinancing for the Philippines road subsector. The project aims to finance the periodic maintenance of about 340 kilometers of national roads on the west coast of Luzon, Visayas, and Mindanao regions; design three roads to be maintained under the project and other roads to be maintained or improved under future projects; and strengthen institutional capacity in the Department of Public Works and Highways. Amount: $62 million loan from ADB’s ordinary capital resources and a $30 million loan from the OPEC Fund for International Development (OFID), the cofinancier for the project.

Singapore

Thailand
Framework for Financial Inclusion Technical Assistance. Despite success in lowering national poverty rates, many of Thailand’s rural poor lack basic access to financial tools such as microinsurance, remittance services, pensions and mobile banking services. This technical assistance will explore supply and demand for microfinance products and services – including any gender bias in terms of access and affordability – and provide the basis for a national strategy for financial inclusion (NSFI) focusing on regulatory and market improvements in microfinance, consumer protection, financial literacy and microinsurance.

Timor-Leste


Viet Nam
Agreement for DFID's Additional Contribution to TF071023 Conformed. Author: Abdo Kahin,Hisham A.Document Date: 2011/12/30.Document Type:Agreement. Disclosure Date: 2012/01/06. Doc Name: Agreement for DFID's Additional Contribution to TF071023 Conformed.Language: English.TF No/Name: TF071023-Vietnam Third Rural Transport Project-988711.Unit Owning: Vietnam Sustainable Development (EASVS). UN Registration No: LICUN.Originating Unit: Resource & Administration Team (LEGRA)
Agreement for DFID's Additional Contribution to TF070789 Conformed. Author: Abdo Kahin,Hisham A.; Document Date:2011/12/30.Document Type:Agreement.Disclosure Date: 2012/01/06.Doc Name: Agreement for DFID's Additional Contribution to TF070789 Conformed.Language: English. Rel. Proj ID: VN-Dfid Trust Fund For Infrastructure Policy And Sector Support. P100208.TF No/Name: TF070789-Trust Fund for Infrastructure Policy and Sector Support (IPSS) for SociUnit Owning: Vietnam Sustainable Development (EASVS).UN Registration No: LICUN. Originating Unit: Resource & Administration Team (LEGRA)
Coastal Resources for Sustainable Development Project: resettlement policy framework. The objective of the Coastal Resource for Sustainable Development Project (CRSDP) is to improve the sustainable management of coastal fisheries in selected coastal provinces of Vietnam.Document Date:2011/12/01. Document Type:Resettlement Plan. Report Number: RP1223. Data Sheet
Integrating watershed and biodiversity management in Chu Yang Sin National Park, Vietnam: implementation completion memorandum. The overall goal of the project was defined as: biodiversity attributes of Chu Yang Sin conserved in the long term within a wider framework of integrated watershed and biodiversity management. The purpose of the project was defined as: build a foundation of support and management for Chu Yang Sin National Park (CYS NP).Document Date:2010/05/30.Document Type: Working Paper.Report Number:66190
Ho Chi Minh City Environmental Sanitation (Nhieu Loc-Thi Nghe Basin) Project: restructuring.The development objective of the Ho Chi Minh City Environmental Sanitation (Nhieu Loc-Thi Nghe Basin) Project is to reduce the incidence of flooding and increase the collection of wastewater in the Nhieu Loc Thi Nghe (NLTN) Basin in Ho Chi Minh City (HCMC), in an environmentally and financially sustainable manner.World Bank.Document Date: 2011/12/29. Document Type: Project Paper. Report Number:66188. Data Sheet
Northern Delta Transport Development Project: P095129-Implementation Status Results Report: Sequence 04 World Bank. Author: Vallely,Paul.Document Date: 2012/01/01. Document Type: Implementation Status and Results Report Report Number: ISR5597
x