Bolivia
BO-T1158 :Support to the design of the multipurpose water resources project for El Alto.This operation will finance the generation of detailed designs and Bank's required environmental, financial, social and climate change studies for a multipurpose water infrastructure and adaptation to climate change project that will be financed through Bank's capital and a grant from the Pilot Program for Climate Resilience under the Strategic Climate Fund (SCF).
BO-T1158: Support to the design of the multipurpose water resources project for El Alto.This operation will finance the generation of detailed designs and Bank's required environmental, financial, social and climate change studies for a multipurpose water infrastructure and adaptation to climate change project that will be financed through Bank's capital and a grant from the Pilot Program for Climate Resilience under the Strategic Climate Fund (SCF).
BO-T1158: Support to the design of the multipurpose water resources project for El Alto.This operation will finance the generation of detailed designs and Bank's required environmental, financial, social and climate change studies for a multipurpose water infrastructure and adaptation to climate change project that will be financed through Bank's capital and a grant from the Pilot Program for Climate Resilience under the Strategic Climate Fund (SCF).
Disaster Vulnerability Reduction Project.APL2:P085727-Implementation Status Results Report: Sequence 12. The purpose of this APL2 project is to reduce the vulnerability of the Capital District of Bogota to adverse natural events, by strengthening its capacity to manage disaster risks, and by reducing vulnerability in key sectors.World Bank.Author:Dickson,Eric. Document Date:2011/12/24.Document Type:Implementation Status and Results Report.Report Number : ISR5272
Land for Agricultural Development Project. P087925.Implementation Status Results Report:Sequence 11.The development objective of the proposed project is to establish a decentralized beneficiary-driven land distribution mechanism that allows organized landless or poor farmers to acquire suitable agricultural lands and implement investment subprojects which puts them on a sustainable, higher-income, livelihood path.World Bank.Author: Pantoja,Enrique;Document Date: 2011/12/21.Document Type:Implementation Status and Results Report.Report Number: ISR5252.
Colombia
National Macroproyectos Social Interest Program Project: P110671 - Implementation Status Results Report: Sequence 03. The Project development objective is to enable access to affordable housing solutions for low-income beneficiaries.Author:Samad,Taimur; Document Date: 2012/01/09 00:00:00. Document Type:Implementation Status and Results Report.Report Number: ISR5766
RG-L1034: Regional Affordable Housing Fund. IDB.The transaction entails an A Loan or Guarantee - to be determined during due diligence - to a Fund to finance the development of housing real estate projects in Brazil, Chile, Colombia, and Costa Rica.
Jepirachi Carbon Off Set Project: P074426 - Implementation Status Results Report: Sequence 09 World Bank. Author:Montanez,Leopoldo; Document Date: 2012/01/01. Document Type: Implementation Status and Results Report. Report Number:ISR5312RG-L1034: Regional Affordable Housing Fund. IDB.The transaction entails an A Loan or Guarantee - to be determined during due diligence - to a Fund to finance the development of housing real estate projects in Brazil, Chile, Colombia, and Costa Rica.
Water And Sanitation Sector Support Project 1st APL: P082973-Implementation Status Results Report:Sequence 12. The Project aims to improve the provision of water supply and sanitation services in Colombia in a financially efficient and sustainable manner through the provision of capital investment subsidies for poverty-focused coverage expansion and service quality improvement.World Bank. Author:Yee-Batista,Carmen Rosa. Document Date: 2011/12/28.Document Type: Implementation Status and Results Report. Report Number: ISR5579
Agricultural Transition: P082167-Implementation Status Results Report:Sequence 16. The Project Development Objective is to strengthen the National Agricultural Science and Technology and Sanitary and Phytosanitary Systems by supporting the joint participation of both the public and private sectors, through the mechanism of production chains, thereby contributing to the competitiveness of Colombian agriculture and improving the accessibility of export-potential products to international markets. World Bank.Author:Arias Carballo,Diego ; Document Date:2011/12/28.Document Type:Implementation Status and Results Report.Report Number:ISR5428
Disaster Risk Management DPL w/Catastrophe Deferred Draw Down Option II. General industry and trade sector (50%);General water, sanitation and flood protection sector (30%);General transportation sector (20%). World Bank.Document Date:2011/12/16.Document Type:Project Information Document.Report Number:AB6873.
Agricultural Transition: P082167-Implementation Status Results Report:Sequence 16. The Project Development Objective is to strengthen the National Agricultural Science and Technology and Sanitary and Phytosanitary Systems by supporting the joint participation of both the public and private sectors, through the mechanism of production chains, thereby contributing to the competitiveness of Colombian agriculture and improving the accessibility of export-potential products to international markets. World Bank.Author:Arias Carballo,Diego ; Document Date:2011/12/28.Document Type:Implementation Status and Results Report.Report Number:ISR5428
Disaster Risk Management DPL w/Catastrophe Deferred Draw Down Option II. General industry and trade sector (50%);General water, sanitation and flood protection sector (30%);General transportation sector (20%). World Bank.Document Date:2011/12/16.Document Type:Project Information Document.Report Number:AB6873.
Peace and Development Project (1st Phase APL): P051306-Implementation Status Results Report:Sequence 13.The project development objective of Phase I is to assist vulnerable, low income and displaced populations in rural and urban communities in the conflictaffected regions in order to reduce the risk of their exposure to conflict and mitigate the negative impact of possible derived effects. The project assumes that building assets is a measure that contributes to mitigate the risk of displacement, and that restoring a basic safety net to displaced families is a vital first step in their social and economic stabilization. The Project will not finance activities related to the armed conflict or conflict related violence, however it provides the support necessary for people to reduce and mitigate the risk of conflict and violence. World Bank.Author:Gomez,Natalia.Document Date: 2011/12/28. Document Type: Implementation Status and Results Report. Report Number:ISR5241
CO-M1083:Savings Products for Low Income Women.The project will promote financial inclusionfor the low income population that receives conditional cash transfers. The project will deepen the access to savings products and services directed to this target population.
CO-G1002: Adaptation to Climate Impacts in Water Regulation and Supply area of Chingaza. IDB. The project will support the implementation of adaptation measures designed to address the consequences of climate change in the water supply and hydrological regulation functions provided by high-mountain wetlands and ecosystems of the Chingaza-Sumapaz-Guerrero corridor. These ecosystems and wetlands are the main drinking water source to the Bogota metropolitan area and its adjoining rural communities. The natural water regulation function of these ecosystems is expected to be seriously affected by changes in the intensification of the water cycle
Support to the National Urban Transit Program Project: P117947-Implementation Status Results Report:Sequence 01. The Project Development Objective is to enhance the efficiency, affordability, quality, safety, and environmental sustainability of the provision of public transit services in the participating cities.World Bank.Author: Cuellar,Mauricio; Document Date: 2011/12/27.Document Type: Implementation Status and Results Report Report Number:ISR4703
Solid Waste Management Program Project: P101279-Implementation Status Results Report:Sequence 05.The project development objective is to improve the quality and coverage of integrated solid waste management services in Colombia by ensuring that waste generated by approximately 300,000 consumers is adequately disposed of in sanitary landfills constructed under the Project.World Bank. Author:Samad,Taimur;Document Date:2011/12/20.Document Type:Implementation Status and Results Report.Report Number:ISR5081
Colombia Doing Business 2012.This economy profile presents the Doing Business indicators for Colombia. To allow useful comparison, it also provides data for other selected economies (comparator economies) for each indicator. The data in this report are current as of June 1, 2011 (except for the paying taxes indicators, which cover the period January- December 2010). The data not only highlight the extent of obstacles to doing business; they also help identify the source of those obstacles, supporting policy makers in designing regulatory reform.Document Date:2011/01/01. Document Type: Working Paper.Report Number: 65251.Volume No: 1 of 1
La Guajira Water and Sanitation Infrastructure and Service Management Project.Restructuring.The objective of the La Guajira Water and Sanitation Infrastructure and Service Management Project for Colombia is to improve the quality of water supply and sanitation services in urban and peri-urban areas of La Guajira, moving towards complete coverage with continuous supply of potable water for urban areas. The project experienced start-up delays which have now been addressed, and the Regional Vice President has approved the associated project closing date extension from December 31, 2011 to October 31, 2015. World Bank. Document Date: 2011/11/30.Document Type: Project Paper.Report Number: 64938.Volume No: 1 of 1
First Programmatic Fiscal Sustainability and Growth Resilience Development Policy Loan. The development objective of the First Programmatic Fiscal Sustainability and Growth Resilience Development Policy Loan (DPL) Program for Colombia is to enhanced fiscal sustainability and strengthened resilience of economic growth. The Government of Colombia has requested a DPL for US$300 million. The DPL is the first of a series of two operations supporting the fiscal management program of the Government of Colombia in the context of increased commodities production (oil and mining), mounting long term social sector liabilities, and rising fiscal risks associated with natural hazards.
CO-M1083:Savings Products for Low Income Women.The project will promote financial inclusionfor the low income population that receives conditional cash transfers. The project will deepen the access to savings products and services directed to this target population.
CO-G1002: Adaptation to Climate Impacts in Water Regulation and Supply area of Chingaza. IDB. The project will support the implementation of adaptation measures designed to address the consequences of climate change in the water supply and hydrological regulation functions provided by high-mountain wetlands and ecosystems of the Chingaza-Sumapaz-Guerrero corridor. These ecosystems and wetlands are the main drinking water source to the Bogota metropolitan area and its adjoining rural communities. The natural water regulation function of these ecosystems is expected to be seriously affected by changes in the intensification of the water cycle
Support to the National Urban Transit Program Project: P117947-Implementation Status Results Report:Sequence 01. The Project Development Objective is to enhance the efficiency, affordability, quality, safety, and environmental sustainability of the provision of public transit services in the participating cities.World Bank.Author: Cuellar,Mauricio; Document Date: 2011/12/27.Document Type: Implementation Status and Results Report Report Number:ISR4703
Solid Waste Management Program Project: P101279-Implementation Status Results Report:Sequence 05.The project development objective is to improve the quality and coverage of integrated solid waste management services in Colombia by ensuring that waste generated by approximately 300,000 consumers is adequately disposed of in sanitary landfills constructed under the Project.World Bank. Author:Samad,Taimur;Document Date:2011/12/20.Document Type:Implementation Status and Results Report.Report Number:ISR5081
Colombia Doing Business 2012.This economy profile presents the Doing Business indicators for Colombia. To allow useful comparison, it also provides data for other selected economies (comparator economies) for each indicator. The data in this report are current as of June 1, 2011 (except for the paying taxes indicators, which cover the period January- December 2010). The data not only highlight the extent of obstacles to doing business; they also help identify the source of those obstacles, supporting policy makers in designing regulatory reform.Document Date:2011/01/01. Document Type: Working Paper.Report Number: 65251.Volume No: 1 of 1
La Guajira Water and Sanitation Infrastructure and Service Management Project.Restructuring.The objective of the La Guajira Water and Sanitation Infrastructure and Service Management Project for Colombia is to improve the quality of water supply and sanitation services in urban and peri-urban areas of La Guajira, moving towards complete coverage with continuous supply of potable water for urban areas. The project experienced start-up delays which have now been addressed, and the Regional Vice President has approved the associated project closing date extension from December 31, 2011 to October 31, 2015. World Bank. Document Date: 2011/11/30.Document Type: Project Paper.Report Number: 64938.Volume No: 1 of 1
First Programmatic Fiscal Sustainability and Growth Resilience Development Policy Loan. The development objective of the First Programmatic Fiscal Sustainability and Growth Resilience Development Policy Loan (DPL) Program for Colombia is to enhanced fiscal sustainability and strengthened resilience of economic growth. The Government of Colombia has requested a DPL for US$300 million. The DPL is the first of a series of two operations supporting the fiscal management program of the Government of Colombia in the context of increased commodities production (oil and mining), mounting long term social sector liabilities, and rising fiscal risks associated with natural hazards.
CO-M1083.Savings Products for Low Income Women.The project will promote financial inclusionfor the low income population that receives conditional cash transfers. The project will deepen the access to savings products and services directed to this target population.
CO-T1215.Implementation of Free Trade Agreements and Seizing of Commercial Opportunities.The general objective of this TC proposal is to maximize Colombia¿s ability to take advantage of the market access opportunities in the high-value added services sector provided by the trade and investment agreements adopted by the country in recent years.
Ecuador
Ecuador. comparing regulation for domestic firms in 183 economies.This economy profile presents the Doing Business indicators for Ecuador. To allow useful comparison, it also provides data for other selected economies (comparator economies) for each indicator. The data in this report are current as of June 1, 2011 (except for the paying taxes indicators, which cover the period January- December 2010). The data not only highlight the extent of obstacles to doing business; they also help identify the source of those obstacles, supporting policy makers in designing regulatory reform.
EC-L1101:Universidad Las Americas UDLA.Expansion of the UDLA`s Quito campus.
Hydro SIBIMBE:P080093 -Implementation Status Results Report: Sequence 03. This is a carbon finance project that was approved in December 2004. Project continues to perform, albeit annual electricity generation is slightly under what had originally been anticipated, due to hydrology and transmission line issues.World Bank. Author: Montanez,Leopoldo. Document Date: 2012/01/02.Document Type: Implementation Status and Results Report. Report Number: ISR3896
ABANICO HYDROELECTRIC PROJECT : P116720 - Implementation Status Results Report : Sequence 04. World Bank.Author: Montanez,Leopoldo; Document Date:2012/01/01. Document Type:Implementation Status and Results Report Report Number: ISR5343
EC-L1103.Banco Guayaquil Subdebt Facility.Subordinated loan of up to US$ 20 million and 8 years tenor, bullet to strengthen solvency and provide financing to lower income individuals and SMEs.
EC-L1101:Universidad Las Americas UDLA.Expansion of the UDLA`s Quito campus.
Hydro SIBIMBE:P080093 -Implementation Status Results Report: Sequence 03. This is a carbon finance project that was approved in December 2004. Project continues to perform, albeit annual electricity generation is slightly under what had originally been anticipated, due to hydrology and transmission line issues.World Bank. Author: Montanez,Leopoldo. Document Date: 2012/01/02.Document Type: Implementation Status and Results Report. Report Number: ISR3896
ABANICO HYDROELECTRIC PROJECT : P116720 - Implementation Status Results Report : Sequence 04. World Bank.Author: Montanez,Leopoldo; Document Date:2012/01/01. Document Type:Implementation Status and Results Report Report Number: ISR5343
EC-L1103.Banco Guayaquil Subdebt Facility.Subordinated loan of up to US$ 20 million and 8 years tenor, bullet to strengthen solvency and provide financing to lower income individuals and SMEs.
Perú
Project Information Document (Concept Stage)- PE Basic Education.General education sector (50%), Public administration- Education (50%) .P123151.Author:Kudo,Ines.Document Date:2012/01/09.Document Type:Project Information Document.Report Number:PIDC197
Strengthening Biodiversity Conservation through the National Protected Areas:P095424.Implementation Status Results Report : Sequence 04.Author: Arcos,Gabriela.Document Date: 2011/12/18.Document Type: Implementation Status and Results Report.Report Number: ISR5262
Strengthening Biodiversity Conservation through the National Protected Areas:P095424.Implementation Status Results Report : Sequence 04.Author: Arcos,Gabriela.Document Date: 2011/12/18.Document Type: Implementation Status and Results Report.Report Number: ISR5262
Venezuela
VE-L1036: Rehabilitation Water Potabilization Plants Program.The operation objective is to improve the operability and efficiency of some of the water treatment plant to the national grid, through improvements and rehabilitation of production systems, operational automation, laboratory, and pumping systems, including training and operational manuals, maintaining SAP coverage and the additional demands.The operation is part of the priority sectors of the current strategy with the country, particularly in supporting initiatives that improve the efficiency of water and sanitation.
VE-L1037: Sanitation Program of Guaire River.The program's objective is the sanitation of Guaire River, through the work of collecting, handling and separation of the affluents and the construction of canals marginal drivers to the river for the treatment of wastewater, including relocation of services, improved intervention and preparation areas of marginal areas for later use.The operation is part of the priority sectors of the current strategy with the country, specifically in supporting initiatives for the execution of projected collection and wastewater treatment.
x
VE-L1037: Sanitation Program of Guaire River.The program's objective is the sanitation of Guaire River, through the work of collecting, handling and separation of the affluents and the construction of canals marginal drivers to the river for the treatment of wastewater, including relocation of services, improved intervention and preparation areas of marginal areas for later use.The operation is part of the priority sectors of the current strategy with the country, specifically in supporting initiatives for the execution of projected collection and wastewater treatment.